TMX3 Auditors will inspect the structural integrity of the container and supervise the loading process to ensure they are loaded to the SOP – Inspection and verification will be sent out  with each container including photographs.

Procedure

  • Container inspection – fit for transport, security
  • Monitor loading to approved method
  • Container checklist completed (by factory)
  • TMX3 verification of container checklist
  • Partial load container SOP

Need some advice?


Share this page

TMX3 have extensive experience in the textiles industry and have built a long list of loyal customers over the years. Some of which are shown below